Bishop Burton College, a land-based educational institution, operates across two campuses and three sites. Bishop Burton campus features approximately 50-60 buildings including student accommodation , a secondary campus includes seven buildings, and the third site operates under a lease agreement near Lincoln
The college required a modern Computer-Aided Facility Management (CAFM) system to enhance operational efficiency and address current challenges in managing facilities and contractors.
Bishop Burton College initially identified the following challenges within the facilities/estates management process:
Planned, Reactive and Asset Challenges
Contractor Management Challenges
Onsite Staffing Challenges
Authentication and Hosting Preferences
Management Reports
In response to the challenges faced, Bishop Burton College recognised the need for a CAFM system that would offer the following:
Maintenance Management
Enhanced Contractor Management
Onsite Staff Efficiency
Authentication and Hosting
Property & Space Terrier
Expansion
After an extensive market exploration and product comparison, Tabs FM was chosen as the provider for the college’s CAFM software solution. The college determined that Tabs FM’s solution was an excellent fit due to its comprehensive functionality, scalability, modern and clean interfaces, experience with other educational institutions, and cost-effective pricing model.
Some of the other key benefits identified were:
Operational Efficiency
Enhanced Contractor Compliance
Scalability
PPM and Reactive Maintenance Efficiencies
User-Centric Approach
The implementation of the CAFM system followed a structured project management approach to ensure a smooth rollout. The process began with an initial kick-off meeting to outline the implementation plan. Key discussions focused on phasing the rollout of modules to prioritise critical functionalities such as Helpdesk/Reactive Maintenance before rolling out PPM tasks and Asset Management. This allowed the project manager to concentrate on essential areas and create a project plan tailored to the college’s requirements.
Data templates were provided to the college for verification and upload by the project team. These templates included site geography, property/location/space, contractors, job defaults, assets, and PPM.
Special consideration was paid to the asset template, where discussions were held about uploading and managing the relationship of child assets relating to a parent, and the impact of this process in the system.
The system workflow was customised to align with the college’s unique processes, addressing specific operational needs.
During the implementation, the college opted for a hosted system rather than the original request of an on-premise installation, and this preference was incorporated into the project plan. This greatly improved the efficiency of the implementation process, allowing the project team to respond to final data queries and configuration quickly.
After initial testing of the build, data review, and workflow verification, detailed and well-paced training sessions were conducted for all stakeholders, to ensure effective system adoption.
Both the college and Tabs FM recognised the benefits of delivering many professional services onsite in addition to remote sessions via Teams. This approach helped to build a strong ongoing relationship between Tabs FM and Bishop Burton College.
By implementing a modern CAFM solution, Bishop Burton College addressed its challenges while preparing for future growth. The Estates Management Database has streamlined operations, enhanced and helped demonstrate compliance, provided meaningful analytical data for job and asset analysis, and provided a scalable platform to support the college’s evolving needs.